Projects
View Mapesa Projects in a larger map
Description | Type | Location | Equipment | Volume | Unit | Date | Status | |
---|---|---|---|---|---|---|---|---|
Sociedad Portuaria Bocas de Cenizas | Construction | Barranquilla, Colombia | Katja | N/A | N/A | MAR2007 | Executed | |
Access Dredging and Port Operations Magdalena | Excavation | Barranquilla, Colombia | Tug, Barge y Leila | 15.000 | M3 | NOV09 | Executed | |
Logistic Support Chevron - Texaco | Logistic | Barranquilla, Colombia | Barge AB 600 | N/A | N/A | N/A | Executed | |
Geological Survey Bocas de Cenizas | Logistic | Barranquilla, Colombia | Katja | N/A | N/A | MAR07 | Executed | |
Directional Dike Repair - Magdalena River | Construction | Barranquilla, Colombia | Tugs, Leila, Barge | N/A | N/A | OCT06 | Executed | |
Bathymetric Studies Barrancabermeja port area | Studies | Barrancabermeja, Colombia | N/A | N/A | N/A | OCT12 | Executed | |
Rodman Dock Expansion | Excavation | Panamá | Leila | 90.000 | M3 | JUL10 | Executed | |
Central Basin Dredging specialized Thermoelectric Tacoa Bay | Excavation | Bahía Tacoa, Venezuela | Leila | 60.000 | M3 | JUL10 | Executed | |
Geotechnical Study, New Port St. Marta | Studies | Santa Marta, Colombia | Tug, Crane | N/A | N/A | SEP10 | Executed | |
Sociedad Portuaria Regional Cartagena. Dredging in the field in spring traque number 9 and Indugraco sector | Dredging | Cartagena, Colombia | Pontoon, barge, tug | 90.292 | M3 | OCT11 | Executed | |
Aguas de Cartagena. Construction of the outfall ditch | Construction | Cartagena, Colombia | Pontoon Leila, Barge, Tug | 18.730,54 | M3 | NOV11 | Executed | |
Algranel. Maintenance Dredging - Algranel | Maintenance dredging | Cartagena, Colombia | Pontoon Leila, Barge, Tug | 9.500,50 | M3 | JUL11 | Executed | |
Unión Temporal Tayrona Shore Base, Maintenance Retramar Dock Cartagena | Maintenance dredging | Cartagena, Colombia | Pontoon Leila, Barge, Tug | 133.769, 43 | M3 | APR12 | Executed | |
Sociedad Portuaria Regional Barranquilla, Docks SPRB | Maintenance dredging | Barranquilla, Colombia | Pontoon Leila, Barge, Tug | 7.435 | M3 | JUN12 | Executed | |
Mamonal Port | Maintenance dredging | Cartagena, Colombia | Pontoon Leila, Barge, Tug | 61.202 | M3 | SEP12 | Executed | |
Algranel | Maintenance dredging | Cartagena, Colombia | Pontoon Leila, Barge, Tug | 30.106,80 | M3 | OCT12 | Executed | |
C.I. Petrocosta | Maintenance dredging | Cartagena, Colombia | Pontoon Leila, Barge, Tug | 12.810,5 | M3 | NOV12 | Executed | |
Sociedad Portuaria Cartagena Area | Maintenance dredging | Cartagena, Colombia | Pontoon Leila, Barge, Tug | 13.888 | M3 | DIC12 | Executed | |
Industrias ASTIVIK | Dredging | Cartagena, Colombia | Pontoon Leila, Barge, Tug | 18.187 | M3 | DIC12 | Executed | |
Portmagdalena | Dredging Port Services | Barranquilla, Colombia | Pontoon Leila, Barge, Tug | 5.5 | Dias | JAN12 | Executed |